System Options
- Constant Volume/Single Zone
- Packaged Rooftop Units
- Split Systems
- Constant Volume/Multiple Zone
- Hot Water Re-Heat
- Electric Re-Heat
- Variable Air Volume
- Hot Water Re-Heat
- Electric Re-Heat
- Dual Duct
- Dedicated Outdoor Air Systems
- Heat Pumps
- Geothermal
- Conventional
- Make-Up Air Systems
- Energy Recovery Systems
- Air to Air
- Plate Exchangers
- Heat Wheels
- Dessicants
- Air to Water
- Loop Systems
- Air to Air
- Exhaust Systems
- Lab Hood Systems
- Boilers
- Hot Water
- Steam
- In-floor Heating Systems
- Radiant Heating Systems
- Chilled Water Systems
- Cooling Towers
- Chillers
- Refrigerant Piping
- Gas Piping
- Testing & Balancing
- Air Systems
- Water Systems
- Indoor Air Quality
- Air Surveys
- Code Compliance
- Energy Analysis/Retrofits
- Building Studies
- HVAC System Evaluations
- Energy Studies
- Green Building Mechanical Systems
-Geothermal Heating & Cooling Systems
-Indoor Air Quality Control
-Energy Recovery Systems
-Water Efficiency/Reduction Systems
Markets Served
- Commercial
- Office Buildings
- Retail
- Restaurants
- Shopping Malls
- Grocery Stores
- Vehicle Showrooms/Auto Repair
- Hotels
- Assembly
- Churches
- Theaters
- Natatoriums
- Gymnasiums
- Institutional
- Schools/Universities
- Art Museums
- Laboratories
- Industrial
- Manufacturing
- Warehouses
- Printing
- Food Production/Packaging
- Pharmaceutical
- Foundries
- Plastics
- Health Care
- Nursing Homes
- CBRF’S
- Clinics
- Hospitals
- Operating Rooms
- Emergency Rooms
- Infectious Isolation Rooms
- Intensive Care Units
- Pharmacies
- Patient Care
- Radiology
- LDRP’S
- Special Applications
- Computer Rooms
- Telecom Rooms
- Electrical Vaults
Contact Us
Aldag/Honold Mechanical, INC.
3509 Business Drive
PO Box 1265
Sheboygan, Wisconsin 53082-1265
Telephone: 920.458.5558
Fax: 920.458.3750
Matt Van Buren, Plant Manager, DLM Holdings
Over the past couple of decades our company has worked on numerous projects and has greatly appreciated the team at Aldag/Honold for their professionalism and ability to achieve deadlines and complete projects with the utmost quality. A dust collector fire had our company anticipating a lengthy downtime and a substantial cost to replace the system, but with Aldag/Honold’s team of engineers and craftsmen we were up and running in the least amount of time and within budget. Our collection system has never been better!!
Matt Van Buren, Plant Manager, DLM Holdings